Skip to main content
(0) Write a Review

Upgrade Kit 12-15/16 long leads AAMI, 989803151771

$104.95
For larger quantities: Request a Quote
Medex SKU:
PHP-989803151771
Packing Info:
1/Each
Usually Ships:
3 - 5 Business Days

Description

Long Upgrade Kit shielded 12-15/16 leads AAMI color coded for PageWriter TC 70. Consisting of 4 additional long lead assy (48" (1.22m0)), 6 shorting plugs, lead separators, 6 colored clips, 6 colored rings, 4 brown base rings and instructions for use. The additional lead sets come pre-assembled with the brown base rings. 1 kit = 1 sales unit.