Upgrade Kit 12-15/16 long leads IEC, 989803151781
$65.95
- Medex SKU:
- PHP-989803151781
- Packing Info:
- 1/Each
- Usually Ships:
- 3 - 5 Business Days
Description
Long Upgrade Kit banana posts shielded 12-15/16 leads IEC color coded for pageWriter TC 70. Consisting of 4 additional long lead assy (48" (1.22m)), 6 shorting plugs, 2 lead separators 3.4 diameter, 4 banana post adapters, 6 colored rings, 4 white base rings and instructions for use. The long additions lead sets come pre-assembled with the white base ring and the banana post adapters. 1 kit = 1 sales unit.